Nov 22,2025

Tender Announcement

1500MWh Lithium Battery Assembly & Energy Storage Integrated Equipment Manufacturing Project (Phase II), Guzhen Town, Zhongshan


Tender Announcement

  1. Project Name: 1500MWh Lithium Battery Assembly and Energy Storage Integrated Equipment Manufacturing Project (Phase II), Guzhen Town, Zhongshan
  2. Tendering Method: Public Tendering
  3. Registration Requirements:
  • Applicants shall be independent legal entities;
  • Enterprises holding a valid Grade 3 or higher General Contracting Qualification for Construction Engineering;
  • Possessing relevant professional constructors;
  • Holding a valid Safety Production License;
  • Consortium bids will not be accepted for this project.
  1. Documents to be Submitted for Collecting Tender Materials:
    Duplicate copy of business license, construction engineering qualification certificate, safety production license, power of attorney from the legal representative, and both sides of the ID card of the authorized representative.
    All the above documents must be stamped with the official seal of the bidder; otherwise, the qualification examination shall be deemed unqualified and the bidding qualification shall be cancelled.
Contact for collecting tender documents: Wen Weiming
Tel: 13192678768
  1. Documents to be Submitted with Bidding Documents:
    Proof of transfer of bid bond, power of attorney from the legal representative, and both sides of the ID card of the authorized representative.
    One copy of each document (stamped with the official seal of the bidder) is required.

Account for Bid Bond Payment:

  • Account Name: Zhongbao New Energy (Zhongshan) Co., Ltd.
  • Account No.: 44050178200709688868
  • Bank: China Construction Bank, Zhongshan Guzhen Sub-branch

Registration Period:

November 22, 2025 to 18:00 November 29, 2025
(Deadline based on actual arrival time in the bank; funds received after 17:00 shall be deemed invalid)
Time: 8:30 – 18:00 daily

Bidding Submission Location:

Guangdong Dejiu New Energy Co., Ltd., 1st Floor, East Gate, Building 2, Tianfu Technology Center,
Shangyuanxi Industrial Zone, Xianan'er, Guicheng Subdistrict, Nanhai District, Foshan City.

Bid Opening Time and Venue:

18:00, November 29, 2025
Conference Room of Guangdong Dejiu New Energy Co., Ltd.
Contact Person: Wen Weiming
Tel: 13192678768
Zhongbao New Energy (Zhongshan) Co., Ltd.
November 22, 2025



Prev News:Dejiu Group Honored as "Model Enterprise for Brand Building" in Foshan Next News:2026 New Year Message
Send Inquiry
Can't find the specific information you’re looking for? Have a question ? Contact Us

Contact Us

  • Tel: 0086-757-81851775/81851776/81851778

  • E-mail: support@dejiusolar.com

  • Add: Building 1-3, Tianfu Science and Technology Center, Guicheng Street, Nanhai District, Foshan City, Guangdong Province

Follow us